德国开元华人社区 开元周游

标题: 美资汽车零部件行业-Techical Project Leader-German [打印本页]

作者: Miffy兔    时间: 8.9.2009 10:57
标题: 美资汽车零部件行业-Techical Project Leader-German
公司主要产品:悬挂系统&减振器
Location在北京通州
汽车或机械相关专业本科或硕士,1-3年工作经验,德语+英语都会作为工作语言,会主要负责和奥地利研发总部的技术沟通以及与大众总部的项目协调
如果你有推荐或者自己感兴趣
请给我邮件:lucywu@kenexa.com.cn

JOB DESCRIPTION - QUALIFICATIONS


Technical Project Leader for the facility in Beijing plant

Technical Project Leader-German


The OE Application Team:
The ‘OE-Application Engineering Team’ has as main task to support OEM Customer Projects on all Technical aspects: 2D/3D Designs, CAE-calculations, DFMEA, prototypes building and testing, make and release BOM (Bill-Of-Material). The OE-Application team covers the complete product gamma (conventional dampers, monotubes, Semi-Active damper systems (CES), modular assemblies, Mc-Pherson struts), and application introduction of new valving systems.

Job Description of Technical Project Leader:

The Technical Project Leader (TPL) takes the lead and is responsible for the coordination of this Development Process with as main target to develop the most optimal product that complies with the OEM Customer Requirements and with our internal standards.

The TPL can count on the support of the Competence centers and internal Design Rules and databases. The TPL is the main point of contact for all technical items, both to the Project Team as to the OEM-Customer. Regular customer contacts are therefore a vital part of the job as TPL in order to guarantee an efficient way of working.
Regarding prototype building, the TPL is the driver to make component drawings, preliminary BOM’s (X-BOM’s) and drawings of necessary tools and jigs to make the prototypes in an efficient way and of good quality.

Further tasks of the TPL include the making of the Validation Plan and Engineering Spec’s, complete the Application Design FMEA (Failure Mode & Effect Analysis) and the launch and follow-up of CAE – calculations.

The TPL attends also technical meetings at the customer.

The expectation is that the TPL has - or gains – sufficient product knowledge and technical understanding in order to run this development in a fluent and efficient way.
The TPL has therefore continuous contact with the Project Team, the Competence centers, the OEM-Customer, Manufacturing, Purchasing and other internal departments.


Qualifications:
- Industrial Engineer (Preferable Mechanical Engineering).
- Adequate technical & mechanical understanding.
- Stress-resistant and a strong analytical and creative approach.
- Good communication skills and able to operate independent within a Team structure.
- Prepared to make business trips if necessary for the job.
- Fluent German speaking and good English.

Detailed Roles & Responsibilties:

The technical project leader:

1)
Acts as single technical point of contact for program manager within project team
2)
Coordinates between core engineering and the different competence centers
3)
Input = RFQ /statement of requirements
(from Program Manager)

4)
Review test reports and take appropriate actions.
5)
Output = full BOM + drawings + calculation reports
6)
Drive design of Strut/shock/module/CES applications
7)
Submits the application DFMEA
8)
Defines RFD, act as interface for core component development (only development at component level)
9)
Defines RFD, acts as interface for product development (development required at shockabsorber level)
10)
Releases specifications of non core - application specific components
1)
Drives NP/ECA/ECR
2)
Executes non-specialized calculations, organize specialized ones
3)
Design of required tools (measurement, assembly, welding,…)
4)
Single point of contact for any application technical concern until SOP + 90 days
5)
Temporarily leads (initiates) 8D until SOP + 90 days until 8D ownership has been defined
6)
Attends customer technical meetings
7)
Can handle more than 1 project
8)
organize analysis of Sample return/Line return until SOP+90 days
9)
Product specific control plan
10)
Assist plant for PFMEA + CP + Process definition
11)
Sample deliveries:
1)
Follow-up on dimensional measurements / results.
2)
Follow-up on correctness of tools – processes
3)
Define work-flow for prototypes
4)
Follow-up on damping measurements
5)
Select dampers to be shipped to customer
6)
Check reports to be sent to customer
7)
Take decision / appropriate action in case of deviations

JD-Technical Project Leader-German-200908.doc

39 KB, 下载次数: 63


作者: Miffy兔    时间: 10.9.2009 14:58
1# Miffy兔

自己顶起来
作者: Miffy兔    时间: 13.9.2009 07:34
谢谢大家的关注




欢迎光临 德国开元华人社区 开元周游 (https://forum.kaiyuan.de/) Powered by Discuz! X3.2